Empty load Commissioning. The mainframe and the analyzer turned right. The running time of the host air load is not less than 1h. When the host air load is running, the mill roll device should be tied tightly with the wire rope, so as to avoid the contact blow between the roller and the grinding ring, such as unconditional, can also disassemble the mill roll device. Host air load commissioning should be smooth, the maximum temperature of lubricating oil must not exceed 800c. Temperature rise shall not exceed 400c.